Silver Processing Cases | How is Silver Processed?

LauraLaura Aug 24, 2022Aug 24, 2022 233233
Warm Tip:

If you want to know more details about equipment, solutions, etc, please click the button below for free consultation, or leave your requirements!

Silver ore in Silver Processing Cases post.jpg

( Silver ore )

In this article, we will mainly describe 2 successful cases of silver ore beneficiation, mainly including project overview, project plan and project results, among which we will pay more attention to the project plan.

01 Introduction of Silver

Back

The chemical symbol for silver, Ag, is a precious metal with a long history of application. Among all metals, silver has the highest electrical and thermal conductivity, good ductility and plasticity, easy to polish and shape, and can be alloyed with many metals. Silver also has strong corrosion resistance, resistance to organic acids and alkalis, and is not easy to be oxidized under ordinary temperature and humidity. In addition, silver is soft, ductile, and has a very high reflectivity, which can reach more than 99%. There are elemental substances in nature, but most of them exist in silver ore in the form of combined state.

02 Classification of Silver

Back

Silver exists in nature in the form of natural silver, sulfide, sulfur salt, etc. Among them, there are more than 60 kinds of silver minerals and silver-containing minerals with silver as the main element, which have important economic value. There are 12 kinds of main raw materials for silver production: natural silver, electrum, argentite, deep red silver ore, light red silver ore, horn silver ore, brittle silver ore, antimony silver ore, selenium silver ore, tellurium silver ore, zinc antimony argentite, sulfur antimony copper silver ore..

#1 Natural Silver

Natural silver is a naturally occurring silver element mineral. Often containing gold, mercury, etc., belonging to the equiaxed crystal system, in the form of irregular granular, massive or dendritic aggregates. The fresh fracture is silver-white, and the surface is gray-black due to oxidation. With metallic luster, Mohs hardness 2.5, strong ductility, good conductor of electricity and heat, specific gravity 10.1-11.1 g/cm3.

#2 Argentite

Argentite is a mineral of hydrothermal origin, which is formed above 173°C, and below this temperature, it transforms into a spiral pyrite with the same composition. It is a mineral raw material for silver refining, chemical formula Ag2S, containing Ag 87.1%, equiaxed crystal system, the crystal is cubic, octahedral, usually dense block. The color and streak are lead gray, the fresh fracture is metallic luster, the Mohs hardness is 2-2.5, the density is 7.2-7.4 g/cm3, and it has weak ductility.

#3 Cerargyrite

Cerargyrite is a halide mineral composed of silver chloride, which is one of the ores from which silver is extracted. Argentite crystals are rare, cubic, pure and colorless, with white microstrips in various light shades that turn violet, purplish-brown and black when exposed to light. The crystals gather together in the form of crusts, shells or blocks. Angle silver mine is soft and can be cut with a knife. The chemical formula is AgCl, the crystal is diamond-like luster, the cryptocrystalline is wax-like luster, the hardness is 2.5, the density is 5.55 g/cm3, and it is ductile.

03 Successful Silver Processing Cases

Back

Case 1 Morocco 500tpd Silver Ore Processing Plant Project

Morocco 500tpd Silver Ore Processing Plant Project2.jpg

( Morocco 500tpd Silver Ore Processing Plant Project )

#1 Project Overview

With the continuous increase of ore mining depth, M Mining Company found that the original 300t/d silver mine cyanidation plant has gradually been unable to meet the current mineral processing needs. The processing capacity cannot reach the expected design due to the long-term disrepair of the processing equipment and the unreasonable technological process, and the silver recovery rate is decreasing year by year. Therefore, M Mining Company decided to build and renovate it.

The metal minerals of the project's ore are natural silver, pyrite, limonite, etc.; the gangue minerals are quartz, feldspar, clay minerals, etc. The element available for recycling is silver.

#2 Project Plan

Crushing stage: 

Two-stage semi-closed-circuit crushing process is adopted. Jaw crusher is used for coarse crushing and medium crushing, cone crusher is used for fine crushing, and circular vibrating screen is used for screening. The crushed ore products are transported by belt conveyors to the original powder ore silo, and then loaded and transported to the proposed new plant site;

Grinding stage: 

Two-stage closed-circuit grinding process is adopted. Wet grid type ball mill is used for the first-stage grinding, jig is used for gravity separation for discharge ore, shaker is used for concentrate selection, and high-weir type single-spiral classifier is used for classification of gravity tailings; wet overflow is used for second-stage grinding. Type ball mill, the second-stage classification adopts the hydrocyclone group. The grinding fineness of the first stage is -200 mesh, accounting for 55-60%; the grinding fineness of the second stage is -200 mesh, accounting for 85-90%;

Flotation stage: 

a rough, three sweep, and two fine processes are adopted. The concentrate dewatering operation adopts a two-stage mechanical dewatering process. A thickener is used for the first-stage dehydration, and a filter press is used for the second-stage dehydration. The filter cake contains about 20% water. The tailings are directly discharged to the original tailings pond, and the backwater is recycled;

Slurry mixing stage of the dressing plant: 

The pulping system is newly built in the original dressing plant, using the method of grabbing the ore, mixing the slurry through a high-concentration stirring tank, and using the existing grinding and grading system for operation. After the cyclone overflow is concentrated by the thickener, it goes to the existing leaching system. The leaching time is more than 60h, and then it is washed in five stages, and the precious liquid is replaced by zinc powder for smelting. After the tailings are treated, they are pumped to the tailings pond.

#3 Project Results

The whole set of dressing plant services has reduced the production cost of the silver ore dressing plant project by 15%, which is 5% lower than the customer's expected investment cost control; after the raw ore is ground, after gravity separation and flotation operations, the silver recovery rate is as high as 83.95%. The whole plant is running stably, the equipment quality is reliable, and the beneficiation indicators and economic benefits have reached expectations.

Case 2 China 5000tpd Silver Polymetallic Ore Processing Plant Project

#1 Project Overview

The main gold-bearing minerals in the ore are silver-gold ore, and the silver-bearing minerals are silver ore, natural silver, sulfur-arsenic-copper-silver ore and silver-gold ore. Metal minerals are mainly pyrite, sphalerite and galena, a small amount of chalcopyrite, chalcocite and arsenopyrite. Metal oxides mainly include magnetite, hematite, siderite, chromite, hard manganese, etc., the content is not high, only magnetite, hematite content to 0.89%. Gangue minerals are mainly: quartz, feldspar, plagioclase, and a small amount of scaly mica minerals (mainly muscovite and sericite).

#2 Project Plan

Two-stage continuous grinding - flotation - comprehensive concentrate regrinding - two leaching and two washing - zinc powder replacement process.

Crushing stage: 

The crushing system utilizes the original four-stage incomplete closed-circuit crushing process, and the particle size of the crushed product is 12-0mm.

Grinding + flotation stage: 

two-stage continuous grinding, one open-circuit roughing + roughing, two sweeping, one selection process, flotation tailings to tailings dry discharge system, rapid flotation concentrate and The flotation concentrate is combined to remove the concentrate and regrind, and the leaching zinc powder is replaced by the system.

Comprehensive concentrate dehydration and regrinding stage: 

the first-stage flotation concentrate and the second-stage flotation concentrate are fed into the concentrate regrinding operation together. Considering that the flotation system and the integrated concentrate leaching system use staged return water, and the flotation integrated concentrate dehydration adopts the concentration-press filtration two-stage mechanical dehydration process. After the filter cake is slurried, the closed-circuit grinding composed of overflow ball mill and cyclone group is used for regrinding, and the grinding fineness is -0.041mm, accounting for 90%.

Comprehensive concentrate leaching, replacement and tailings dehydration stage: before leaching, the overflow of the thickener is gold and silver-containing precious liquid, the precious liquid flows to the precious liquid pool for storage, and the gold-containing precious liquid is purified and press-filtered to the solution solid suspension < 5ppm, and the filtrate flows by itself After purification, the precious liquid tank is sucked to the deoxidizer by the vacuum system for deoxidation, the zinc powder feeder is fed with zinc powder for replacement, and then replaced by the replacement filter press to finally obtain the product gold mud, which contains about 30% silver. Intermediate products, gold mud is sent to the smelting workshop for processing. After replacement, the filtrate flows to the replacement lean liquid tank for slurry mixing and washing. After washing, the dregs enter into the chamber filter press, and the filter cake enters the return water system after being washed with water.

Cyanide residue removal and flotation stage: 

since the raw ore contains a part of recyclable lead and zinc, it is enriched to a certain grade after the flotation silver process, and after washing by cyanide leaching, it is enriched in the tailings, and the washed The cyanide residue contains CN-10mg/L. In order to comprehensively recover the lead and zinc in the cyanide residue, the leaching and flotation of lead and zinc is carried out. The lead selection operation adopts the flotation process of one roughing, one sweeping and three finessing, and the flotation lead concentrate is produced, and the lead tailings enter the zinc processing operation; Concentrate; Zinc beneficiation tailings and flotation silver tailings are combined into tailings dehydration operation, and discharged after fully meeting the standards. Dehydration stage of lead and zinc concentrate: the dehydration of lead concentrate and zinc concentrate adopts the second-stage mechanized dehydration operation, the first-stage concentration adopts a thickener, and the second-stage dehydration adopts a ceramic vacuum filter for filtration, and the filter cake after filtration is the final lead concentrate, zinc Concentrate products are unloaded to concentrate warehouses for sale. Tailings dehydration stage: flotation tailings are pumped to the slurry buffer tank of the tailings dry discharge workshop, and then pumped to the dehydration cyclone for dehydration and classification, and the underflow of the cyclone enters the dehydration screen for second-stage dehydration. The upper dry material contains about 20% water and is transported to the tailings pond dry stack through the belt; the underflow from the dewatering screen enters the tailings buffer tank, the overflow of the cyclone enters the thickener for concentration and dehydration, and the underflow of the thickener passes through the filter press after dehydration. After dehydration, the pressure filter tailings contain about 20% water, and the dehydrated dry tailings are transported to the tailings pond for storage by belt. The overflow water from the thickener and filter press is returned to the production backwater pool for recycling. Backwater system: The backwater system is divided into two systems, the flotation backwater reuse system and the cyanidation backwater reuse system.

#3 Project Results

The grade of Ag concentrate is 972.46g/t and the total beneficiation recovery rate is 78.31% in Zone I and purchased ore. The overall recovery was 90.32%.

04Summary

Back

Combining the above two cases, we can learn that the appropriate beneficiation process and process must be determined in combination with the characteristics of the ore and other characteristics of the mining area. You can click the Chat button to learn more solutions.


RELATED PRODUCTS

DOWNLOAD THE COPY

DOWNLOAD THE COPY

Submit Your Message

Please leave your message here! We will send detailed technical information and quotation to you!

SUBMIT YOUR MESSAGE

Please leave your message here! We will send detail technical info and quotation to you!

+86

13810565920

facebook twitter linkedin
whatsapp
logo